Fully automatic 220L blow molding machine-3 layer
OG-HY90-100-90

1.Price
Goods | Description | Qty. | Price (USD) |
OG-HY90/100/90 | 220L three layers Double L-ring drum blow molding machine, special designed for Double L-ring drum . | 1 set | |
220L Mould | 220L L-Ring Drum Mould,made up of aluminum. | 1 set | |
Total | 2 sets | ||
Notice: The above prices are factory price with tax. | |||
Control system | Adopts 12 inch German Siemens PLC control system.Siemens touchscreens support multiple language options, including English, making them suitable for global users. The interface can be easily switched to English, ensuring convenience for English-speaking users. Siemens offers English-speaking technical support worldwide. Users can access assistance through various channels, ensuring timely resolution of problems. Siemens touchscreens deliver stable performance in industrial environments. The English interface ensures smooth operation, reducing the risk of errors and making them suitable for demanding applications. |
|
Adopts Three-generation 200-point MOOG wall thickness controller,it can be adjusted, independent private server system, precise control and high wall thickness accuracy. And avoid the traditional mechanical knobs and buttons, using full touch screen technology. |
| |
Extrusion system | Adopts Siemens inverter controller:Siemens frequency converters utilize advanced energy-saving technologies to automatically adjust motor speed based on load requirements, significantly reducing energy consumption and improving energy utilization efficiency. |
|
Adopts Siemens motor:Siemens motors utilize advanced design and manufacturing technologies, achieving high efficiency classes, which significantly reduce energy consumption and help users save on energy costs. Adopts Inovance motor: With energy conversion rates exceeding 90%, Inovance servo motors significantly reduce power consumption, aligning with global energy-saving trends. Advanced magnetic flux regulation technology further enhances efficiency, making them suitable for long-term, high-intensity operations. Siemens motor and Inovance motor can be chose by customer |
| |
| ||
KINGWELL screw adopts High Strength and Hardness 38CrMoAl. Excellent Wear Resistance The nitrided 38CrMoAl screw exhibits exceptional wear resistance. It can maintain a good surface condition over long-term use, reducing wear and thereby extending the service life of the screw. This is particularly important for blow molding machine screws, as they operate in high-temperature, high-pressure, and high-friction environments. |
Material:Nitrided 38CrMoAlA | |
Die head system
| Adopts Nitrided 38CrMoAlA die head:The surface of the 38CrMoAl nitrided die head has undergone precise processing and nitriding treatment, featuring a high degree of smoothness. This can reduce the flow resistance of the plastic melt within the die head and enhance product quality. Multi layers design:all can be designed into single-layer,double-layer,three-layer,four-layer and so on according to the customer's market demand.multi layers die head not only can produce the multi layers production,also can produce the single layer production |
Material:Nitrided 38CrMoAlA
|
Hydraulic system | Adopts INOVANCE Servo hydraulic system controller : By precisely controlling the output power of the hydraulic system, it can avoid unnecessary energy waste and improve the energy utilization efficiency of the whole system. Compared with traditional hydraulic control methods, it can save a certain amount of energy consumption and reduce production costs, can save 40%-50% of electric energy. |
|
Adopts Japan SUMITOMO hydraulic pump:Some Sumitomo hydraulic pumps use patented technologies to increase operating efficiency through axial and radial pressure, etc., while reducing power loss and saving energy. |
| |
Adopts Japan YUKEN hydraulic valve: Japan's Yuken hydraulic valves use advanced throttle technology to effectively control the flow and pressure of hydraulic oil, improving energy utilization efficiency and reducing energy consumption. |
| |
Clamping system | Adopts Three-plates structure design:simple structure,high strength ,easy installation. |
T.slot design is easy for mold installation |
Adopts three clamping cylinder : It can bigger the clamping force and clamping speed.
| ||
Pneumatic system | Adjustable pressure flow:can control the pressure flow according to different products and improve the molding rate of products. |
High-quality pneumatic valve |
The Circuit system | KINGWELL circuit layout and design adopts SCHNEIDER brand spare parts, it is achieve CE standard. |
|
Auto loader | Adopts PLC control,operate by the HMI Screen and free for customer. Three feeding types can be selected. IBC machine can choose vacuum or spiral, water tank machine can choose vacuum or spring. |
|
3. Fully automatic high-speed hollow forming production system
Model: OG-HY90/100/90
OG-HY90/100/90 series automatic high-speed blow molding machine can produce chemical packaging barrels, food, architectural coatings, pharmaceutical packaging barrels, blow molding tool bags, automobile fuel tanks, automobile hollow parts, deflector plates, hollow seats, desktop boards, large blow molding toys , dock buoys, blow molding trays, large blow molding pipe fittings, blow molding accessories in industry, agriculture, military and other industries, the machine is especially suitable for hollow blow molding of PE, PP and other raw materials, with a production capacity of 150 molds/hour cycle).
Basic configuration:
l Die head: 3 layer vertica structure, fast color change.
l Extrusion system: It adopts imported automatic temperature control device, and the screw is driven by frequency conversion motor + hardened gear box to realize stepless speed regulation
l Clamping device: Hydraulic fixed two tie rod opening and closing mechanism, good stability (linear guide type)
l Hydraulic system: The complete hydraulic system adopts imported components and uses proportional control circuit
l Electronic control system: adopt Japan Panasonic full computer control system, all use world famous brand electrical components
Basic Specification | ||
applicable material | HDPE | China·KINGWELL |
capacity range | 220L,3layers | |
Voltage | Pending | |
total power | 390kw | |
average power | 180kw | |
productivity | 20pcs/h | |
Auto Feeder | ||
hopper material | stainless steel | |
feeding type | vacuum loaded | |
feeding motor | 11kw | |
Extrusion System | ||
Screw diameter | 90/100/90mm | Nitrided 38CrMoAIA |
Screw L/D ratio | 30:1 | special designed screw can ensure the material plasticizing uniform and efficient |
Extruder motor | 55/75/55kw | |
Reducer | Guomao 250*2/280*1 | Best quality brand in china ,long life and low noise |
Screw heating power | 4kw*12 | |
Plasticizing capacity | 350kg/h | |
Die head | ||
Accumulator capacity | 20kg | designed by ourselves and get the patent |
Die diameter | Max 300mm | |
Die head heating power | 50kw | |
Clamping System | ||
platen size | 1400*1500(W*H) | smooth running, no noise; the clamping force is big |
clamping cylinder | 230 120*2 | |
clamping cylinder stroke | 1000mm | |
clamping force | 1200KN | |
distance between platens | 900-2300mm | |
max. mould size | 1200*1500mm(W*H) | |
Blowing and cooling system | ||
stretching stroke | according to products | |
blow pin up/down stroke | 500mm | |
air seat stroke | 400mm | |
maximum air pressure | 0.8Mpa | |
air consumption | 0.8×3(MPa × Cubic meter per minute) | |
Cooling method | Circulating water | |
Water pressure | 30MPa | |
Cooling water consumption | 0.3×20°×30(MPa × degree × Cubic meter per hour) | |
Hydraulic system | ||
main oil tank capacity | 890L | Servo motor, less energy consumption, high efficiency, low noise |
main oil pump | gear pump125CC | |
main oil pump motor | 37kw | |
Servo oil tank capacity | 200L | |
Servo oil pump model | Plunger pump22 | |
Servo oil pump motor | 7.5kw | |
Electronic system | ||
Main operation panel | Touch screen 12' | |
Control system | PLC | |
Thickness control points | 200 points | |
Temperature control | PLC module | |
Main frame | ||
Up/down stroke | 500mm | |
Up/down motor | 4kw | |
5.Supplier details of major parts and components of equipment
1. Hydraulic parts
NAME | SUPPLIER |
Gear pump | 125cc Sumitomo Japan/125cc |
Hydraulic valve | YUKEN |
Oil pipes,connections | Joint venture enterprise |
Seals | DZ TAIWAN DZ |
Servo valve | MOOG Japan MOOG |
NAME | SUPPLIER |
Gear pump | /125cc Sumitomo Japan/125cc |
Hydraulic valve | Taiwan Yuken |
Oil pipes,connections | Joint venture enterprise |
Seals | DZ TAIWAN DZ |
Servo valve | MOOG Japan MOOG |
2. Electronics
NAME | SUPPLIER |
Microcomputer control system | Siemens PLC Siemens touch screen |
Temperature control components |
External temperature control |
Intermediate relay | France Schneider |
Contactor | France Schneider |
Air switch | France Schneider |
Breaker | France Schneider |
Thermorelay | France Schneider |
AC-Motors | China Inovance |
Converter | China Inovance |
3. Gear box
Name | SUPPLIER |
Gearbox | Guomao |
4.Air control system
Name | SUPPLIER |
Magnetic exchange valve | NINGBO SHENGLONG |

FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 120 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as as airplane, visa, travel expenses,other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as pick up and see off ,dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.
E-mail