图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register
  • 立即询盘
  • 我要分享



OG-F800Single Shaft Shredder

 

  • Inquiry
  • Share

 

P1:Customer Information

Company Name

KINGWELL VIET NAM CO.,LTD

Contact Person

MR AU

Telephone Number /Cell Phone

+8618816899059

 

P2:Machine Description

Qty

Unit Price

OG-F800Single Shaft Shredder

1


Machine Configuration

l  SIEMENS motor

l  SCHNEIDER electric system,with PLC and Touch Screen

 

 

OG-F800Single Shaft Shredder

Hopper Inlet

1300×800 mm

Discharge Height

565 mm

Motor Power

37+2.2 kw

Rotor Speed

80 RPM

Ram Travel

815 mm

Rotation Operation length

800 mm

Rotor Knives

35+4 pcs

Hopper Volum

1500

Screen Size

Φ40 mm

Machine Size

2800×1765×2080 mm

Machine Weight

4000 KGS

 

 

P4:Manufacturing / SHIPPING / WARRANTY & SPARE PARTS

   MANUFACTURING

Enerpat manufacture recycling equipment at our factories in Jiangsu, China to strict European standards. We use good quality and Europe Brand parts or their equivalent for durability and reliability.  Each machine is built to the highest possible standards and endures strict Quality Control before it leaves any of our factories.

   SHIPPING

We ship machines around the world.  All machines are supplied in Seaworthy Wooden Crates and are safely loaded into shipping containers. We provide paperwork, information and assistance throughout safely loaded into shipp

   WARRANTY & SPARE PARTS

All Enerpat equipment is supplied with a full 12-Month FREE parts warranty.  Spare parts are stocked throughout the world and are readily available via global courier services such as DHL.

   After the warranty period, spare parts can be ordered at any time from Enerpat.

 

 

P5 Enerpat Customer List

  

 

 

FOB China.

- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l  Equipment that is considered valid must meet the following requirements:

l   Specifications and functions of the machine match the content of this contract.

l   Electrical, mechanical and control systems run smoothly.

l   Run out sample products as required.

l   Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v  First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v  2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

 

 


图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号