OG-LX550 Single Raw cup single packing machine
技术参数与外形尺寸
Configuration& Dimension
序号 SN. | 内容及名称 Fitting Name | 数量 QUA. | 明细 Details |
1 | 最大薄膜宽度 Max film width | 1 | 90-550mm |
2 | 包装速度 Max speed | 1 | 25-30次/分,每条50个计算 25-30 cycle/min, ever cycle base on 50 pieces cups |
3 | 适应薄膜厚度 Film thickness | 1 | 0.025-0.06mm (OPP/PE ) |
4 | 包装长度 Bag length | 1 | 200-800mm按用户可定做 200-800mm adjustable |
5 | 杯子高度 Cup height | 1 | 35-150mm |
6 | 杯子间隔 Cup spacing | 1 | 3.0-1.0mm |
7 | 总功率 Power | 1 | 4KW |
8 | 电源 Power source | 1 | 220V/1P |
9 | 机器外形尺寸(长*宽*高) Dimension (L*W*H) | 1 | 主机(Packing part)2200*950*1250mm 副机(Counting part) 3300*410*1100mm |
10 | 总重量 Weight | 1 | 1000kg |
备注: Note: | |||
主要电器件:
Main Electrical Part List:
序号 SN. | 内容及名称 Fitting Name | 数量 QUA. | 明细 Details |
1 | 触摸屏 Touching screen | 1 | 台湾威纶 Taiwan Weinview |
2 | PLC | 1 | 西门子 Siemens |
3 | 温控表 Temperature meter | 2 | 日本富士 Japanese Fuji |
4 | 减速电机 Gear box | 宁波中大 Made in China | |
5 | 数杯电机 Counting motor | 1 | 国产步进电机 Made in China |
6 | 变频器 Inverter | 1 | 英威腾 INVT |
7 | 伺服电机0.75KW+驱动器 Servo motor and driver 0.75KW | 1 | 三菱 Mitsubishi |
8 | 伺服电机0.4KW+驱动器 Servo motor and driver 0.4KW | 1 | 三菱 Mitsubishi |
9 | 色标光电眼 Photo-electricity eye | 1 | 上海亚太 Made in China |
10 | 接近开关 Proximate switch | 2 | 欧姆龙 Omron |
11 | 按纽开关 Bottom | 4 | 宁波亿太若 Made in China |
12 | 开关电源 Switching power supply | 1 | 台湾明纬 Taiwan Mingwei |
13 | 气缸、电磁阀、气动元件 Cylinder, valve & air fittings | 6 | 台湾亚德客 Taiwan Airtac |
14 | 中间继电器 Intermediate relay | 1 | 欧姆龙 Omron |
15 | 电磁阀 Solenoid valve | 1 | 国产一佳 Made in China |
16 | 空气开关 Air switch | 3 | 韩国LG Korean LC |
17 | 光纤传感器+对射线两条 Optical fiber+ radial wire | 1 | Altivar |
18 | 放大器 Amplifier | 1 | Altivar |
备注: Note: | |||
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 30 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.
E-mail