图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register
  • 立即询盘
  • 我要分享



OG-SJ150 造粒机recycling machine

 

  • Inquiry
  • Share

Recycling machine OG-SJ150造粒机

Main extruder (主机)

NO

Name

Description

Picture

1

螺杆料筒

Screw barrel

直径D: 150mm,长度L:4500mm

材料:38CrMoAla(HV >=950)

 

2

电机

Motor

90KW 

上海力普

Shanghai Lipu

 

3

变频器

Inverter

90KW 

森兰

 

4

减速箱

Gearbox

ZLYJ 315

硬齿面

 Hard tooth surface

 

5

换网器

Screen changer

350*350

 

 

Accessories 配件

NO

Name

Description

Picture


切粒机

Cutting Machine

7.5KW

合金刀片220mm宽,32片

alloy knife with 32pieces and 220mm width of knife

 

2

电表箱Electrical box

品牌:正泰

Brand:zhengtai

 

3

水槽

Water tank

5M 

不锈钢

stainless steel

 

4

陶瓷加热ceramic heating

整体罩

 

5

定量喂料

Quantitative feeding

安全快捷

 

 

FOB China.

- Delivery time: The Seller will hand over the goods to the buyer after 45 business days(35 days making machine and 10 days deliver), excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l Equipment that is considered valid must meet the following requirements:

l ü Specifications and functions of the machine match the content of this contract.

l ü Electrical, mechanical and control systems run smoothly.

l ü Run out sample products as required.

l ü Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 100USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

  

 


图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号