图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register
  • 立即询盘
  • 我要分享



OG-Series Express Bag Blowing Machine

 

  • Inquiry
  • Share



OG-系列快递袋吹膜机配置一览表

 

型号

OG-2G55-1200

主机部分Main part

主电机 main motor

22KW*2(变频控制)inverter control

齿轮箱 gear box

173*2(国标)high-strength hard tooth surface

螺杆料筒 screw and  barrew

55*2  30:1

螺杆材料 screw matirial

38铬钼铝氮化处理 38Chromium molybdenum aluminum nitrogen treatment

三通 T- Die

180

模头die

250  LDPE

模头材质 matirial of die

45#碳钢 45#carbon steel

风环 air ring

780

风机 blower

5.5KW

气泵 air compressor

没有 no

螺杆冷却风机 cool fan

4pc

加热圈 heating

不锈钢stainless steel

最大挤出量 capacity

100 kg/h

吹膜折径 width of film

800-1200mm


薄膜单层厚度 thickness of single-  face film

0.01-0.1mm

旋转模头 rotary die

有 yes

快速换网 high speed net change

选配 OPTIONAL

牵引架Traction frame

牵引辊宽度 width of traction roller

1300mm

牵引皮辊直径 diameter of traction roller

150mm

牵引电机 traction motor

1.5KW蜗轮电机变频控制worm gear motor inverter control

人字板 Letter“A”board

A字型木条式wooden

压紧方式 Pressing method

汽动 cylinder control

压花、插边 emboss gusset

选配 OPTIONAL

定型圈 bubble setting

鼠笼式squirrel-cage

牵引架是否升降 up and down

没有 no



收卷

rewinder

收卷皮辊长度Rewinder roller length

1300mm

收卷皮辊直径diameter of rewinder roller

250mm

独立单收卷rewinder

双收卷double rewinde

力矩电机Torque motor

10N.M

力矩表Torque meter

20A

收卷辊Rewinder roller

4条(镀白铁辊)normal

机器总高 hight

6.0m

电柜

Electric box

变频器invertor

易能 ENC

低压电器Low voltage electrical equipment

正泰 Chint


温度表Temperature controller

亚泰 yatai (aiset)

电流表ammeter

国产Made in china


电压表voltmeter

国产Made in china

总功率 Total Power

50kw

电压 voltage

3相380v 50HZ

3 phase 380V 50HZ

价格price

FOB CHINA

27000 USD

 

            

                                         

FOB China.

- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l  Equipment that is considered valid must meet the following requirements:

l   Specifications and functions of the machine match the content of this contract.

l   Electrical, mechanical and control systems run smoothly.

l   Run out sample products as required.

l   Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v  First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v  2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine

 


图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号