Interview
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD
Add: Room 2116, Building 1 TIMES BLOSSOM PLAZA, No.101-1, Lixin 12th street, Xintang town, Zengcheng district, Guangzhou,Guangdong Province ,China
CHIEF REPRESENTATIVE
Skype:kingswelgroup
Wechat: ChampionMachinery QQ: 1123006779
Tel: +86-18816899059 Head phone/Wechat: 15018408881
Website: www.champion-automation.com , www.championmachinery.cn
Email: Sales@champion-automation.com ,18816899059@163.com
Video: www.youtube.com/kingswelgroup
PVC fiber reinforced hose technical configuration list
Vacuum feeding→ extrusion→ mold forming→ spray cooling→ traction→ winding→ drying-outer mold coating forming →spray cooling →traction → sealing→ Punching →Coiling
UNITE PRICE: FOB PRICE (including one series of spare parts)
NO. | Name | MODEL | Quantity (SET) | Unit price (USD) | Total price (USD) |
Main machine | |||||
1 | 65-30 singer screw extrusion machine | OG-SJ65/30 | 1 | 50000 | 50000 |
TOTAL PRICE: 50,000 USD | |||||
Note: | |||||
1) Customer Voltage and Frequency: 380V/50HZ, 3 Phase | |||||
2) Appendix 1: technical data; appendix 2: components brand list | |||||

1. 65/30 single screw extruder 2. Forming mold 16mm/22mm 3. Spray cooling water tank(3 m) 4. Belt haul-off tractor | 2 sets 2 sets 2 sets 2 sets |
5. Dryer | 1 set |
6.Coiler | 1 set |
7.Winding machine | 1 set |
8.Sealing machine | 1 set |
三、 Main technical paraments of production line | |
| |
1. The output capacity of production line | 40kg- 100kg/h |
2. The working speed of production line | 3m-15/min |
3. Tube range of production line | Φ8—38mm |
4. Water consumption of production line | 4m³/h( excluding circulating water) |
5. Compressed air pressure of production line | 0.6~0.8mpa |
6. Air consumption of production line | 0.1m³/min |
7.The water supply pressure of production line | 0.4mpa |
8. The installed power of production line | 65 KW |
9. The total length of production line | 18m |
四、 65 singer screw main extruder | |
| |
A、 Main technical paraments | |
1. The transmission ratio of the reducer | 16:1 |
2. Screw diameter | Φ65 |
3. Screw aspect ratio | 30:1 |
4. Speed ratio | 65RPM |
5. Plasticizing and mixing extrusion capacity | 80kg/h |
6. Heating power | 12kw |
7. Main motor power | 15kw ( Siemens Beide) |
8. Control method | ABB frequency |
Temperature control table | RKC400 |
Low voltage electrical appliances | Siemens |
B、 Deceleration system
1. Using hard tooth face and griding technology
2. With high strength and high torque output, ultra-static performance
3. With forced cooling system
4. Place of origin Hangzhou Shuguan g
C、 Screw barrel type |
180 type | ||
1. Material | 38CrMoALA | ||
2. Nitriding layer hardness | HV 940 | ||
3.Nitriding layer thickness | 0.4mm | ||
4.Nitriding brittleness | <Level 2 | ||
5.The length-diameter ratio of the screw barrel | 30:1 | ||
6.Blanking seat with cooling water ring | |||
7. Bushings have friction resistance grooves |
D、Barrel heating and temperature adjustment system
1. Heating system Cast Aluminum rings
2. Heating zones 3 zones
3. Heating power 12KW
4. Temperature-regulating fan(Taiwan) 0.18×3
五、 Internal and external forming molds (Subject to 6 drawings)
2. Mold heating section 2 zones
3. Mold heating power 1.5kw
4. Mold material 2Gr13
5. The mold is vacuumed. The inner tube is equipped with a blower.

六、 Cooling device (Customers external connection water inlet pipe and self-prepared pressure water pump .)
1. Effective length 2. Calibration box material | 3000mm Stainless steal | |
3. Bamboo tube type | 10 sets | |
4. Forward and backward movement stoke | 500MM | |
5.Water supply capacity | 6m³/h | |
6. Horizontal movement stoke | 50MM | |
7. Forward and backward movement mode | manual control | |
8. Working center height | 1000mm | |
9. Central height of adjustment range | 50mm | |
七、 Belt haul-off tractor | ||
| ||
1. Effective traction engagement length | 600MM | |
2. Maximum traction force | 2000N | |
3. Traction motor power 4. Control mode 5. Maximum traction speed |
ABB | 0.75KWX2 (2.2KW frequency Inverters control) 15M/MIN |
6. Up and down traction belt lifting stroke | ±50MM | |
7. Traction pipe diameter circumference | Φ50MM | |
8.Working center height | 1000mm |
八、 Dryer | |
1.Heating element | heating pipe |
2.Heating power | 4KW |
3.The effective length of the heating box | 1000MM |
4.Working center height | 1000MM |
5.Work center adjustment range | 120MM |
九、Winding machine (adjust the tightness of the wire in two ways. rubber band and wire tensioners) | |
1.Number of Left wefts | 14 sets |
2.Number of right wefts | 14 sets |
3.Longitude | 4 sets |
4.Turntable drive | power 1.5KW X 2 |
5. Control mode | ABB (5.5KW inventor control) |
6.Working center height | 1000mm |
7.Semi-enclosed cover | |
十、 Coiler | |
![]() | |
1.Motor power | 1.5kw |
2.Maximum winding thickness | 400mm |
十一、Sealing machine(pedal type) | 1 set |
power | 300W |
十二, Punching machine | 1set |
PRODUCT

FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 45 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 100USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

Copy product links
Long by picture save/share
