Interview
Drip irrigation pipe production line

设备配置、技术、价格方案书
Equipment configuration, technology and price proposal
名称/Name | 型号/规格Model / specification | 产地/材质/Place / material |
螺杆/screw | 75/38 | 舟山/Zhoushan |
| ||
主电机功率 Main motor power | 75kw | 伺服电机sifu |
减速箱 Reduction gearbox | 250型方箱/Type 250square box | 江苏国茂/JiangsuGuomao |
换网器 Screen changer | 长效换网器/Long acting screen changer | 济南/zhengzhou |
真空、冷却箱 Vacuum, cooling box | 10米(4米+6米)/10(4米+6米)meters | 304不锈钢,加除水装置 Stainless steel water removing device
|
触摸屏 Touch screen | 松下 | 进口/Imported |
PLC | 松下 | 进口/Imported |
伺服电机 servo motor | 松下 | 进口/Imported |
温控表 Temperature control meter | 汇邦温控/Federal temperature control | 江苏/Jiangsu |
光纤、接近开关 Optical fiber, proximity switch | 奥托尼克斯 | 韩国 |
卷取方式 Take-up mode | 2000w 双伺服电机,带张力控制,带子不会产生拉伸 | 松下/ Panasonic |
牵引方式 Traction mode | 皮带式牵引/Belt traction | 德国进口防滑皮带 Antiskid belt imported from Germany |
| ||
生产速度 Production speed | 0-220米每分钟/0-220 meters per minute | |
压轮粘合方式 Press wheel bonding mode | 伺服电机 400w 1台(松下) | 进口/Imported |
最大挤出量 Maximum extrusion | 120kg/h | |
选片驱动功率 Chip drive power | 2kw 铝壳电机 | 浙江/Zhejiang |
滴头筛选 Emitter selection | 最新式全自动第六代筛选盘 选片识别能力强 The latest fully automatic sixth generation screening disk Strong chip selection and recognition ability | 自主生产/Autonomous production |
滴头供应速度 Emitter supply speed | >2000个/min | |
滴头间距 Emitter spacing | 可调 | |
滴头运输功率 Discharge power of emitter | 750w伺服电机1台(松下) | 进口/Imported |
真空泵功率 Vacuum pump power | 550w 漩涡泵1台 | 上海/Shanghai |
牵引功率 Traction power | 2.2kw*2 双伺服电机(松下) | 进口/Imported |
卷曲驱动功率 Crimp drive power | 2.2kw*2 伺服电机(松下) | 进口/Imported |
收卷排线 Winding and winding line | 750w*1 伺服电机(松下) | 进口/Imported |
打孔方式 Drilling method | 轮式打孔 伺服电机4台(松下) | 各自控制,可实现双孔双打。 Double hole double play |
视觉系统 Vision system | 打孔摄像带自动报警,报警——收卷自动停止 | |
储存器 | ||
| ||
额定功率 Rated power | 105kw | |
外形尺寸 Outline size | 30m*3m*2.7m | |
重量 weight | 4500kg | |
制品直径 Product diameter | 16mm | |
制品厚度 Product thickness | 0.2-0.4mm 厚薄也可根据客户要求做技术改变 | |
生产原料 Production material | 可用HDPE、LDPE、LLDPE再生料 HDPE, LDPE and LLDPE recycled materials can be used | |
辅机 | 螺杆型空压机、储气罐、冷干机、冷水机20P、打包机、烘干搅拌机、打包机、打压泵 | |
价格: | USD | |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine