Interview
![]()
65型无结网挤出机配置(双机头)
Knotless Net Extrusion Line OG-WJW65-2

UNITE PRICE: FOB PRICE (including one series of spare parts)
NO. | Name | MODEL | Quantity (SET) | Unit price (USD) | Total price (USD) |
Main machine | |||||
1 | Knotless Net Extrusion Line | OG-WJW65-2 | 1 | 36000 | 36000 |
2 | Mold | 2 cavity | 2 | Free | |
TOTAL PRICE: 230,000 USD | |||||
Note: | |||||
1) Customer Voltage and Frequency: 380V/50HZ, 3 Phase | |||||
2) Appendix 1: technical data; appendix 2: components brand list | |||||
Ⅰ 主要部分The main part of extrusion line:
编号 № | 名称 Name | 数量 Quantity | 图片 Picture |
1 | 挤出机 Extruder | 1 set |
|
2 | 自动吸料机 Automatic vacuum suction machine | 1 set |
|
3 | 挤出模头, Extruder head | 2 sets |
|
4 | 模具 Mold | 2 pcs |
|
5 | 水箱 Water tank | 2 sets |
|
6 | 牵引 Puller | 2 sets |
|
7 | 水槽 water tank | 2 sets |
|
8 | 收卷 Winder | 2 sets |
|
9 | 配电柜 Distribution cabinet | 1 set |
|
Ⅱ 主要参数 Main parameters
型号Model | OG-WJW65-2 |
螺杆直径 Screw diameter | Φ65mm |
产量Output | About 20-40kg/h |
总功率Total power | About 45kw |
电源Power supply | 三相three phase 380v/50Hz |
外形尺寸External dimension | 18×5×2.2 (m) |
重量Weight | About 3.5T |
Ⅲ 详细配置Particular specification
1. 挤出机Extruder
主电机功率Main motor power | 11 KW |
主机控制方式Pattern of main motor control | 变频调速Frequency control of motor speed |
螺杆材料Barrel material | 38CrMoALA |
螺筒外直径Outer diameter of barrel | φ105mm |
变速形式Pattern of speed change | 挤出机专用减速机Special speed reducer |
加热圈Heating ring | 不锈钢加热圈Cast aluminum heater |
加热功率Heating power | 12KW |
冷却方式Pattern of cooling | 水冷Water |
2. 机头模具Extruder head and mold
机头Extruder head | 高速机头, 变频调速 High speed extruder head, frequency control of motor speed |
机头电机功率Extruder head motor power | 2 X 4Kw |
机头电机控制方式 Pattern of extruder motor control | 变频调速 Frequency control of motor speed |
机头加热区Heating zone of extruder head | 2个2pcs |
加热功率Heating power | 2 X 3KW |
模具Mold | 高速钢材质 淬火 研磨 High speed steel material, quench, skive |
3. 水槽Water channel
加热功率Heating power | 2 X 9KW |
尺寸Size | 4000x200x230MM X 2 |
4. 牵引Puller
牵引形式Pattern of pulling | 牵引辊牵引Pull roller |
牵引辊个数Pull roller quantity | 5+5 |
牵引电机功率Pull motor power | 4 X 0.75KW |
牵引电机控制方式Pattern of pull motor control | 变频调速Frequency control of motor speed |
5. 收卷 Winder
收卷轴数量Winder shaft | 4个4pcs |
收卷电机功率Winder motor power | 8NM |
Ⅳ. 配件清单List of spare parts for free
M12 机头螺丝 M12 Extruder head screw | 2 个 2pcs |
M6内六角螺丝M6 Hexagon screw | 12个12pcs |
机头加热圈 Extruder head heating ring | 1个 1pc |
螺筒加热圈Barrel heating ring | 1套1set |
固态继电器Solid-state relay | 2个2pcs |
温控表Temperature controller | 1个1pc |
模具两个( |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

Copy product links
Long by picture save/share
