图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register

OG-SJ45 PVC foam webbing production line

Interview

Product Detail

OG-SJ45 PVC foam webbing production line

Technical parameters of OG-SJ45 PVC foam webbing production line:                     a set

Serial number

Name

Quantity

1

Ø45 extrusion host

1unit

2

Extrusion moulds

1set

3

Embossed rollers

1set

4

3 metre sink

1unit

5

Small belt tractor

1unit

6

Torque double-station winder

1unit

OG-SJ45 pvc foam webbing

Technical parameters of the production line:

1.Φ45 extrusion host        

1 set

A)Screw

--Diameter

45mm (PVC pellet screw)

--Aspect ratio

28:1

--Material

High-grade nitriding steel 38CrMoAlA

--Surface treatment

Nitriding mirror polishing

A)Barrel

--Material

High-grade nitriding steel 38CrMoAlA

--Inner surface treatment

Nitriding grinding

--Barrel cover

Stainless steel

--Heater

Stainless steel heater

--Heating control area

Zone 3

--Barrel heat dissipation zone

Zone 3

--Cooling system

Taiwan Multi-Wing Cooling Fan (180W*4)

--Barrel inlet

Circulating water cooling

C) Gearbox (square hard tooth surface high-torque gearbox)

--Cabinet material

Alloy cast steel (40CrMnMo

--Gear form

Helical gears

--Gear material

20CrMnTi (hard tooth surface grinding)

--Shaft material

40Cr

--Lubrication system

Pressure lubrication system

D)Control system

--Electrical cabinet form

Conjoined electrical cabinet

--Form Ben Contron

Inverter Control (Inovance Inverter)

--Control the power

11kw Motor

--Power supply

Three-phase five-wire 380V*50HZ

 

2.Extrusion moulds

1 set

--Mould material

S136H

--The mandrel

Precision grinding

--Mould heaters

Stainless steel heating ring

--Product dimensions

According to the customer's model

 

3.Embossed rollers

2 set

--Roller material

Stainless steel


--Scroll wheel pattern

Up and down scroll wheels






4. 3 metre sink

1 set

--Sink length

3 metres

--Material

Stainless steel

--Water pump

0.55KW 1 unit

--Vacuum pump

2.2KW, 1 unit

 

5.Small belt tractor

1 set

--High-efficiency and high-stability surface foamed PU multi-hook dragging

--High-efficiency and high-stability synchronous belt deceleration transmission

--Motor control power

0.75KW

--The inverter controls the power

0.75KW Inovance inverter is used

6.Automatic induction of double-station winding

1 unit

--Power

Torque motors

--Automatic metering

Technical requirements: automatic sensing

Spare parts:               

Serial number

Accessory name

Quantity

Remark

1

Scissors

1


2

Adjustable spanner

1


3

Allen key

1set

Ф1.5~Ф10 

4

Screwdriver

2

2 each of + font and – font

5

High temperature thermocouple wires

1

 strip

6

Ammeter

1

20A

7

Barrel heating ring

2


8

Inverter manual

1


9

Heating ring for the head

2


 FOB China.

- Delivery time: The Seller will hand over the goods to the buyer after 45 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l Equipment that is considered valid must meet the following requirements:

l ü Specifications and functions of the machine match the content of this contract.

l ü Electrical, mechanical and control systems run smoothly.

l ü Run out sample products as required.

l ü Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

 


OG-SJ45 PVC foam webbing production line
Long press to look detail
Long by picture save/share
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully
图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号