图片展示

MR ALADDIN :   18816899059@163.com

MR AU:                auvuchi@163.com 

0086-18816899059

0086-15018408881

Hello! login Register

OG-RM8565 Servo Cup Making Machine

Interview

Product Detail

OG-RM8565 伺服制杯机

OG-RM8565 Servo Cup Making Machine

技术参数 Technical  parameter

适应的材料 Suitable materials

PP、 HIPS、 PET、 PS、 PLA


适应片材宽度 Sheet width

620mm-870mm


适应片材厚度 Sheet thickness

0.4-2.5mm


最大成型面积 Max.Forming area

850mm×650mm


最小成型面积 Min.Forming area

650mm×450mm


制品向下成型高度

Height of downward forming

≤180mm


最高空转速度 Max.Rate of dry running

≤48Times/min


开合模高度

Height of opening and closing mould

下动模台行程≤250mm

Stroke of lower moving mold table≤250mm


最大锁模力 Max.clamping force

85T


电源功率 Electric power

183KW (加热功率) +  40KW (运转功率) =223KW 183kw heating power+40kw motor power


  电源规格 Power supply specification

AC380v50Hz,4P(50mm2 )+1PE(25mm2 ) 三 线五线制 three-phase five-wire system

气源压力 Air pressure

min0.6MPa

机器尺寸 Machine size

7.0M(长 L)*2.20M(宽 W)*3.20M(高 H)

整机重量 Total weight

大约 10 吨 About 10 ton

 

主要电气元件清单

Main Electrical components list

NO

Name

Manufacturer

Origin

1

 

触摸屏  Touch screen

 

 

China

2

PLC  可编程序控制器

PLC programmable logic controller

 

 

 

 

 

 

 

 

 

 

 

Japan

3

定位模块  Positioning Module

4

扩展通讯线

Extended communication lines

5

扩展底板

Expansion backplane

6

数字量输入、 输出模块 Digital input/ output module

7

主基板  Main board

 

8

PLC   电源

PLC power supply

 

 

Taiwan, China

9

伺服电机  Servo motor

 

 

Japan

10

伺服驱动器  Servo drives

 

11

 

减速机  Reducer

 

 

USA

 

12

温度控制模块

Temperature control module

 

 

China

13

总开关  Main breaker



14

空气开关  Air switch

15

可调断路器  Adjustment breaker

 

 

 

 

France

16

接触器  Contactor

17

常开点  Open point

18

通用继电器  Purpose relay

19

电气维修灯管  Lamp

20

带灯按钮  Buttons

21

急停开关  Stop switch

22

主令开关  Main switch

23

报警灯  Warning lights

 

24

 

真空泵Vacuum pump

 

China

25

收卷/放卷电机  Rewinding/ Unwinding motor

 

 

 

 

 

China

26

送片电机  Sheet sending motor

27

链轨调节电机  Chain adjustment

motor

28

模台调节电机  Mould table adjustment motor

29

温控模块

Temperature controller

 

 

 

 

Taiwan,China

30

限位开关  Limit switches

31

感应开关  Sensor Switch

32

固态继电器  Solid State Relays

 

 

 

33

 

 

加热瓦  Heater

 

 

 

 

 

Ireland/China

 

34

 

成型阀  Forming valve

 

 

 

America

 

35

 

气动原件  Pneumatic components

 

 

Taiwan,China

 

Detailed descriptionofthewhole machine

1.  放片装置  Sheet setting device

1.1  由气缸提升上料; Lift feeding by cylinder

1.2  适用片材直径 1 米以内; Sheet max. Diameter:≤1000mm

1.3  由超声波传感器来确定预送料的长度, 可检测高透明片材,避免因摆锟对片材表面造成的刮花;

The  length  of  the  pre-feed  is  determined  by  an  ultrasonic  sensor,  which  can detect highly transparent sheets and avoid scratches on the surface of the sheet caused by pendulum.

1.4  送片由电机驱动一对夹送辊, 带送片自动控制。

The feeding is driven by a motor with a pair of clamping rollers, which are automatically controlled by the feeding sheet.

2. 送片装置 Feeding device

2.1  送片装置采用4.4KW  日本安川伺服电机配强珠减速机驱动, 伺服电机总线通讯控制,控制精度在±0.2mm 内;

The film feeding device adopts 4.4KW YASKAWA servo  motor  and  QIANGZHU reducer drive, servo motor bus communication control, control accuracy within ±0.2mm

2.2  链轨材料为特殊钢材硬化处理后拼装组合而成,带通水冷却装置,并配上观测水压压力表,提供供油嘴可对链条导珠进行润滑;

The chain  rail  material  is  made  of  special steel  hardening, with water cooling device and equipped with observation water pressure gauge, and an oil supply nozzle can be provided to lubricate the chain guide beads.

2.3 配有 2 段式为自动调整功能,  由于 2 台电机单独调节, 也可以同步调节; 在冷片进入时,自动控制链轨为平行状态, 到一定温度下, 自动张开至喇叭口状态。

Equipped with a 2-stage automatic adjustment function, since the two motors are

adjusted separately, it can also be adjusted synchronously; When the cold plate enters, the  automatic control chain  rail  is  in  a  parallel  state,  and  at  a  certain temperature, it automatically opens to the flared state.


  

 

 

                                   (送片平台细节图 Detail diagram of sheet feeding device)

3. 加热系统 Heating system

3.1 加热区探头瓦片采用爱尔兰CERAMICX 口陶瓷加热片, 其余采用江苏天宝陶瓷加热片 ;

The heating zone probe tiles adopts ceramic heating plate imported from Ireland CERAMICX, and the rest ceramic heating tiles adopts Jiangsu Tianbao;

3.2  电热规格采用: 上下炉 13 区纵向并联, 及上下炉各 10 区横向排布。 一共 33 区。

The electric heating specifications adopt: The 13 zones of the upper and lower electric furnaces are connected in longitudinal parallel, and the each 10 zones of the upper and lower electric furnaces are arranged horizontally. Total 33 zones.

3.3 温度控制系统可以精准的控制温度, 参数设定在触摸屏上设定, 带有断线报警, 可自动判


  

断某区的加热器的正常工作;

The  temperature  control  system  can  accurately  control  the  temperature,  the parameters  are  set  on  the  touch  screen,  with  a  broken  wire  alarm,  and  can automatically judge the normal operation of the heater in a certain area.

3.4 电炉可选配光电检测掉片自动退炉并停机的保护装置;

The electric furnace can be equipped with a protection device for photoelectric detection of chip loss, automatic unloading and shutdown;

3.5 框架采用铝型材、 不锈钢板拼接结构;

The frame adopts aluminum profile and stainless steel plate splicing structure;

 

(温度控制系统细节图  Detail diagram of the temperature control system)


  

(温控信号处理模块  Temperature-controlled singal processing module)

 

(电炉加热瓦细节图 Detail of electric furnace heating tiles)


  

 

(铝合金电炉架 Aluminum alloy electric furnace frame)

4.  模内切工位: In mould cutting station

4.1 机架采用国标 120#方管钢钢板组合焊接定型处理而成, 底座焊后再进行龙门加工平面; The   frame   is    made   of    national   standard    120#   square   pipe    steel   plate combination welding and shaping treatment, and the base is welded and then the gantry processing plane.

4.2  工位站开合模结构由下固定底座、 下开合模连杆支撑组件, 下开合模动模台、 上固定座、上模具模架及 4 条Φ100mm 立柱组成;

The opening and closing mold structure of the station is composed of the lower fixed base, the lower opening and closing die connecting rod support assembly, the lower opening and closing die moving mold table, the upper fixed seat, the upper  opening  and  closing  die  connecting  rod  support  assembly,  the  upper opening  and  closing  die  moving  mold  table,  the  upper  mold  base  and  4  Φ 100mm columns;

4.3  焊接式底座、动模台、上模台及模架的安装基准面由大型进口数控加工中心一体加工后组装而成, 从而提高设备组装精度, 同时也提高设备生产过程的稳定性;

The installation datum of welding base,  moving  mold table,  upper  mold table and  die  frame  is  assembled  by  a  large  imported  CNC  machining  center  after integrated processing, so as to improve the accuracy of equipment assembly and the stability of the equipment production process.

4.4  立柱采用优质钢经调质后表面镀硬铬精磨而成;

The  column  is  made  of  high  quality  steel  after  hard  chrome  plating  and  fine grinding on the surface after quenching and tempering.

4.5  动模台由  15KW 日本安川伺服配合美国 GNORD 硬齿面斜锥齿减速机电机驱动曲臂连杆结构进而推动五支点进行开合模, 伺服电机总线通讯控制, 所有连杆采用日本 IKO 轴承传

动与铜合金套, 传动效率高, 减少机械磨损, 便于维护; 动模台开合行程≤250mm;


 

The  moving  mold table is driven  by  15KW YASKAWA servo with the American GNORD  hard  tooth  surface  inclined  bevel  tooth  reducer  motor  to  drive  the toggle connecting rod structure and then promote the five fulcrums to open and close the  mold,  servo  motor  bus  communication  control,  all  connecting  rods adopt   Japanese   IKO    bearing   transmission   and   copper    alloy   sleeve,    high transmission efficiency, reduce mechanical wear, easy to maintain; Moving mold table opening and closing stroke≤ 250mm;

4.6 本机上模台调模方式标配为手动锁紧螺母方式

The standard mold adjustment method of the upper mold table of this machine is manual locking nut method.

4.7  成型站配备独立上拉伸装置采用  11KW  日本安川绝对值伺服电机配高速滚珠丝杠驱动, 采用直连式的丝杆螺母结构; 具有拉伸速度快, 定位稳定, 提高产品的均匀及稳定性的优点, 拉伸升降运动行程≤230mm,  制品可向下成型深度≤180mm。

The forming station is equipped with an independent upper stretching device, adopts 11KW YASKAWA absolute servo motor and high-speed ball screw drive, and adopts a direct-connected lead screw nut structure; It has the advantages of fast  tensile  speed,  stable   positioning,  and  improved  product   uniformity  and stability.  Stretching  lifting  stroke  is  ≤  230mm,  products  can  be  down-forming depth ≤ 180mm.

4.8  成型站配备两款顶杯装置, 分别为气缸顶杯装置与机械式手动可调式顶杯装置。

The forming station is equipped with two types of push-cups-up devices, namely

the   cylinder   push-cups-up   device   and   the    mechanical   manual   adjustable push-cups-up device.

 


 

 


  

 

(成型阀和拉伸结构 Forming valves and stretch structure)

5.  制品堆叠工位 Product stacking station

5. 1 定制型高速机械手, 自动整理。

Customized high-speed manipulator, automatic sorting.

5.2 机械手传动采用高速伺服电机配台湾利茗高速行星减速机, 轻量化设计

The  manipulator  transmission  adopts  high-speed  servo  motor  with  Taiwan Liming high-speed planetary reducer, lightweight design.

5.3  机械手程序参数可调, 可客户自编程序周期。

The program parameters of the manipulator are adjustable, and the customer's own program cycle can be programmed.

5.4  机械手整机电机采用日本安川电机系列, 有主机运动控制器整体控制, 实现闭环功能 。 The manipulator motor adopts the YASKAWA motor series, which has the overall control of the host motion controller to achieve the closed-loop function.

5.5  产品自动整理流程: Automated product organization process

5.5.1  产品由两轴平移机械手取出, 放置在一道积料框, 在这个框进行叠杯; 两轴平移机械手由高速低惯量伺服电机驱动;

The product is taken out by a two-axis translation manipulator and placed in a material   accumulation   box,   in   which   the   cup   is   stacked;   The   two-axis translation manipulator is driven by a high-speed, low-inertia servo motor.

5.5.2  积料框数量到达后, 该框会自动开闸, 杯子落入一个由伺服电机驱动的转接板上, 转接板会高速行走到垒杯区;

When   the   number   of   accumulation    boxes   is    reached,   the   frame   will automatically open and the cup will fall into an adapter plate driven by a servo motor, which will travel at high speed to the cup stacking area.

5.5.3 在垒杯区将整模的杯子整合成一排的形式存在整合框内, 整合方式是在转换板的下方设


 

置一个往上顶的装置, 这一排整合完成后, 转换板再次高速返回到接杯区等待接杯, 转换板在中间会有个等待区, 当后段出瑞问题时, 积料框的杯子会直接排在输送带上输送出来。 从而不暂停成型机的自动运行;

In the cup stacking area to integrate the whole mold of the cup into a row of the form of the integration frame, the integration method is to set up a device to the top under the conversion plate, after the integration of this row, the conversion plate returns to the cup receiving area again at high speed to wait for the cup, the conversion plate will have a waiting area in the middle, when the problem occurs in the back section, the cup of the accumulation box will be directly discharged on the conveyor belt to transport out. This does  not stop the automatic operation of the forming machine.

5.5.4  整合完成一排的杯子由另一套自动翻转架进行抬高后, 翻转至放平后, 再下降至输送带位置;  自动翻转架所有驱动都由总线型的日本安川伺服电机完成;

After  the  integration  of  a  row  of  cups,  they  are  raised  by  another  set  of automatic  flipping  frames,  flipped  to  flattened,  and  then   lowered  to  the conveyor belt position; All drives of the automatic tilting frame are completed by bus-type YASKAWA servo motors.

5.5.5  平齐到输送带后,  由一组长行程气缸, 将整排杯子推至分道形输送带上;

After flushing to the  conveyor  belt,  a  set  of  long-stroke  cylinders  pushes  the entire row of cups onto the divided conveyor belt;

5.5.6  分道形输送带将杯子输送到卷边机或者包装机的流水线上,此分道形输送带上的每道杯子都已经是统一数量, 可以直接配备枕式包装机快速包装;

The  aisle  conveyor  belt  conveys  the  cups  to  the  crimping  machine  or the assembly line of the packaging machine, and each cup on this aisle conveyor belt  is  already  a  uniform  quantity,  which  can  be  directly  equipped  with  a pillow packaging machine for rapid packaging;

**  此流程可有效降低更换模具的时间与成本, 更换模具需要更换如下配件:

This  process  can  effectively  reduce  the  time  and  cost  of  replacing  the  mold, which requires the replacement of the following accessories:

*模块 1  机械手吸盘板 Module1 Manipulator suction cup plate

*模块 2  机械手叠放的积料框 Module2 Accumulation frame stacked by manipulator

*模块 3  积料框下方接料的转换板 Module3 Adapter plate for receiving material under the accumulation box

*模块 4  垒杯区整合框 Module4 Cup Area Integration Box

以上配件都是模块化设件, 在更换时, 只需要固定在相应的工位上即可, 所以驱动动力都是伺服电机完成, 可数字化存储每套模具的参数, 更换相应模具, 调出参数就可使用。

The above accessories are modular components, when replaced, only need to

be fixed on the corresponding station, so the driving power is completed by servo motor, can digitally store the parameters of each set of molds, replace the corresponding molds, and call out the

parameters can be used.


  

(机械手细节图  Detail diagram of robot)

 

(产品自动整理装置  Product automatic collection device)


  

6.废边收卷装置(该设备建议配套在线粉碎机)

Waste sheet winding device (suggest to equip with an online Crusher)

5.1 独立收卷装置一套; 收卷装置由恒张力模式收卷;

One set of independent winding device; The winding device is winding by constant tension mode

7.润滑系统 Lubrication system

7.1  模台润滑系统采用全自动润滑装置, 注油频率在人机界面上设定;

The mold lubrication system adopts a fully automatic lubrication device, and the oil injection frequency is set on the touch screen.

7.2  油壶有油位报警功能, 在缺油会在人机界面上提醒操作人员。

The oil can has an oil level alarm function, which will alert the operator on the touch screen when the oil is short.

 

 

7.  气动元件 Pneumatic element

7.1  气动元件成型阀与气动压料阀采用美国 MAC 大流量电控阀;

The forming valve and vacuum valve in the pneumatic components adopt the American MAC high-flow electric control valve

A.  主动进气成型阀采用4 组, 减短片材成型吹气时间;

The active intake molding valve adopts 4 groups to shorten the blowing time of sheet molding

B. 气动压边圈气阀采用 2 组,  以高低压形式控制, 对杯口成型压料可控性提高


 

The pneumatic edge pressing ring valve adopts 2 groups, which is controlled in the form of  high and  low  pressure,  and  the controllability of the forming  pressure material at the cup mouth is improved.

7.2  其余气动控制元件及执行元件均采用台湾亚德客品牌;

The rest of the pneumatic components adopt the Taiwan AirTAC brand;

 

8.  控制系统 Control system

8.1 整机控制系统人机界面为可推拉的滑轨式安装, 以方便操作;

The touch screen of the whole machine control system is a sliding rail installation that can be pushed and pulled to facilitate operation.

8.2  控制系统采用日本基恩士高性能运动控制器 (最多可控制 256 轴伺服电机), 对各个伺服电机进行全闭环的控制, 整机伺服电机采用日本安川品牌伺服电机由总线通讯控制, 消除了因为电路的干扰而影响定位精度的问题; 安川伺服是三相 AC220V 系统, 有独立的干式隔离型铜线变压器供电, 变压器置在机器内部, 控制柜配备远程操作模块。

The   control    system   adopts   Japanese    KEYENCE    high-performance   motion controller  (up  to  256  axes  servo  motor),  the  full  closed-loop  control  of  each servo  motor,  the  servo  motor  adopts  Japanese  YASKAWA  brand  servo  motor controlled   by    bus    communication,   eliminating    the   problem    of   affecting positioning accuracy due to circuit interference; YASKAWA Servo is a three-phase AC220V  system  powered  by  a  separate  dry-isolated  copper  wire  transformer with a transformer inside the machine and a control cabinet equipped with a remote operation module.

8.3  配备 15 寸 MCGS 人机界面, 可远程协助操作;

Equipped with 15-inch MCGS touch screen, remote assistance operation;

8.4  开关、 按钮、 断路器、 接触器及中间继电器均采用法国施耐德品牌;

Switches,  buttons,  circuit  breakers,  contactors  and  intermediate  relays  are  all made of French Schneider.

8.5  接近开关及传感器采用台湾阳明品牌;

The proximity switch and sensor adopt Taiwan FOTEK brand;

8.6 温度系统采用汇川PLC 温控模块, 继电器采用台湾阳明 SSR 固态继电器;

The temperature system adopts INOVANCE PLC temperature control module, and the relay adopts Taiwan FOTEK SSR solid state relay;

8.7  控制柜置于设备的内部, 具有更方便的维护型, 控制柜配备了空调恒温恒湿系统。

The control cabinet is placed inside the equipment and has a more convenient maintenance  type.  The  control  cabinet  is  equipped  with  an  air  conditioning constant temperature and humidity system


  

 

(15 寸 MCGS 人机界面 15-inch MCGS touch screen)


 

 

(控制电柜细节图 Detail diagram of electric control cabinet)


  

(维修通道细节图 Detail diagram of the maintenane channel)


9.选配 Optional:

可选配加装为数控电动调模, 调模精度为±0.03mm。

Optional digital electric mold adjustment on the mold platform, the mold adjustment accuracy is ± 0.03mm

10. 电炉排列图及功率分布

Electric furnace arrangement diagram and power distribution(Up and Down)

 

 

 

 

FOB Guang Dong China.

- Delivery time: The Seller will hand over the goods to the buyer after 120 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment

- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install

 

Set up :

- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.

Acceptance :

l Equipment that is considered valid must meet the following requirements:

l ü Specifications and functions of the machine match the content of this contract.

l ü Electrical, mechanical and control systems run smoothly.

l ü Run out sample products as required.

l ü Must have a certificate of quality of the place of production and documents attached to the machine.

ARTICLE 2: PAYMENT METHOD

v The buyer makes payment to the seller in 02 times by transfer to the seller's account.

v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.

v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.

ARTICLE 3: WARRANTY

Warranty period: within 12 months from the acceptance date of the equipment.

During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.

(If the device is faulty by the user or is affected by unintended issues such as

Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)

 

ARTICLE 4: BUYER'S LIABILITY

1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,

The buyer is responsible for dropping the item at the buyer's address to the correct location

2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.

3 The buyer pays the seller under Article 4 of this contract.

4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.

5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .

 

ARTICLE 5: SELLER'S LIABILITY

1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.

2 Vendors undertake:

Asian. Ensure time and progress of equipment handover

B. Assurance of quality and content in accordance with agreement requirements.

C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.

 

 

 

 


OG-RM8565 Servo Cup Making Machine
Long press to look detail
Long by picture save/share
INQUIRY

在线询盘 MORE+
  • 联系人 *

  • 手机 *

  • 描述

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Inquiry Content:


You have no items to require

Add Successfully
图片展示

© 2025 GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD all rights reserved

Contact us
GUANGDONG CHAMPION AUTOMATION TECHNOLOGY CO.,LTD

Telephone: 020-38912384

Email :

Sales@champion-automation.com

Fax: 020-38912463

Tel: 0086-18816899059, 15018408881

Add:Room 2116,No 101-1 ,Li Xin 12th street, Xin Tang Town, Zeng Cheng District, Guang Zhou, Guang Dong province, China

 

Hotline
0086-18816899059
Office hours
from Monday to Saturday
Qrcode
Scan QR code
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.
粤ICP备2022108158号