Interview
OG-ZC750S Hydraulic auto cup making machine(double servo)

表1:送片机
Data A:Sheet setter
序号 | 机组部件 Unit component | 规格型号 Specification & model | 品牌 Brand | 数量 Qty |
NO. | ||||
1-1 | 送片减速带电机 Gear motor | RV63-0.55KW | 1 | |
1-2 | 伺服电机 Servo motor | 送片 4.4kw伺服电机 Sheet sending 4.4kw servo motor | 日本安川 YASKAWA JAPAN | 1 |
1-3 | 气动压合 Pneumatic pressing | SC63*50*50 | 亚德客气缸 AIR TAC Cylinder | 2 |
1-4 | 气动上料 Pneumatic feeding | SU125X400 | 亚德客气缸 AIR TAC Cylinder | 2 |
1-5 | 摆动辊 Swing Roller | 启动送片和停止送片自控 Automatically start and stop sheet delivery | 1 |
表2:成型机
Data B: Thermoforming machine
2-1 | 主电机 Main motor | 15kw伺服电机 15kw servo motor | 安川 YASKAWA JAPAN | 1 |
2-2 | 机架采用标准 Rack standard | 100X100 100X50方管 100X100&100X50 Square tube | ||
2-3 | 气动元件 | 电磁阀 | 日本SMC SMC JAPAN | 1 |
2-4 | 拉伸装置 Stretching system | 11kw汇川伺服电机 11kw servo motor | 安川 YASKAWA JAPAN | 1 |
2-5 | 润滑系统 Rubricating system | 全自动润滑装置 Automatic rubricating system | 国产 CHINA | 1 |
2-6 | 成型阀 Forming valve | 模具成型气阀 1寸 Mold forming valve 1inch | 日本SMC SMC JAPAN | 2 |
2-7 | 链轨 Caterpillar track | 组合结构 带冷却装置 宽度手动调整 Combined structure with cooling device width manual adjustment | 1 | |
2-8 |
加热系统 heating furnace | 240X60-0.65kw陶瓷远红外线加热器 240X60-0.65kw Ceramic far infrared heater |
天宝 TIANBAO CHINA |
1 |
国产品牌 CHINA | ||||
不锈钢上下加热炉 Stainless steel heating furnace | ||||
上电炉10*12区 下电炉10*11区 横向1区 合拼21区 Upper heating furnace 10*12pcs-12area Lower heating furnace 10*11pcs-11area Pre-heating furnace 1area | ||||
上下电炉可自动纵横向进退 Whole heating furnace running automatic | ||||
2-9 | 气源过滤采用 Air source filtration | 三联体, 模台吹杯气流大小可调 Triplet, adjusting Template air blowing | ||
2-10 |
合模机构 Template running structure | 上下固定板,由4条Φ95mm导柱与中模台组成 Upper & lower fixing template, composed by 4 Φ95mm guide pillars and middle template | ||
导柱采用45#钢经调质后表面 镀硬铬精磨而成 The guide pillar is made of 45# steel after tempering and polishing, and the surface is plated with hard chrome | ||||
表3:废边收卷装置
Data C: Edge side winding system
3-1 | 机上收卷装置 Machine winding device | RV63-0.55 kw | 1套 1set | |
3-2 | 配减速器 | 电机0.55 kw | 1套 | |
Reducer | Motor 0.55kw | 1set |
表4:电气控制柜
Data D: Electric control cabinet
4-1 | 整机控制屏一套 | ||
A set of control screens | |||
4-2 | 整机由PLC控制 Control by PLC | 采用西门子PLC, 台湾威纶12寸彩色终端触摸屏 Adopt Siemens PLC, Taiwan weilun 12inch touch screen | |
4-3 | 温控仪采用 Temperature meter | 带PID调节 可控温控模块 With PID Controllable temperature control module | 台松 TAISONG |
4-4 | 加热瓦 Heater | 加热电炉240*60-650w Heating furnace 240*60-650w | 天宝 TIANBAO |
4-5 | 加温探头线 | 温控信号连接K线 The temperature control signal is connected to the K line | 台湾进口 TAIWAN |
4-6 | 调压模块 regulator module | 北京灵通 LINGTONG | |
4-8 | 接近开关 | 日本欧姆龙 OMRON | |
4-9 | 接近开关 中间续电器 接触器 按钮 | 施耐德 SCHINEIDER | |
4-10 | 电流表 电压表 互感器 K型热电偶 Ammeter Voltmeter transformer type K thermocouple | 国产 | |
表5:整机主要技术参数
Data E: Main technical parameters
5-1 | 最大成型面积 Max.Forming Area | 750X520mm |
5-2 | 最大冲剪面积 Max.Cutting Area | 700X450mm |
5-3 | 生产速度 Production speed | 15~30次/分钟 15~30cycle/min |
5-4 | 最大成型深度 Max.forming Depth | ≤260mm |
5-5 | 适应材料 Material | PP HIPS PE PET |
5-6 | 整机重量 Machine weight | ~9吨 ~9Ton |
5-7 | 整机功率 Total power | ~150KW |
5-8 | 外形尺寸 Machine Dimensions | ~7.5mX2.8mX3m(长 * 宽 * 高) ~7.5mX2.8mX3m(Length * Width * Height) |
ARTICLE 1 .
CIF China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays ( 1- 5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment, from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
1 . Equipment that is considered valid must meet the following requirements:
2 . Specifications and functions of the machine match the content of this contract.
3 . Electrical, mechanical and control systems run smoothly.
4 . Run out sample products as required.
5 . Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2 : PAYMENT METHOD
The buyer makes payment to the seller in 02 times by transfer to the seller's account.
First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer ( IF YES) . The seller will send a notice of delivery to the buyer.
ARTICLE 3 : WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the
Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to
repair the equipment. All costs incurred will be borne by the Seller.
( If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4 : BUYER' S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 380V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three- phase electric switches, electric lines, steam- lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 100USD each day .
ARTICLE 5 : SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine

Copy product links
Long by picture save/share